RPCs @ e-crlab

Last day

Last week

All data

 
  • Log

    13/11/2013 19h50m:

    Changed Gas Bottle

    17/04/2013 12h00m:

    Changed RPC:

    • RPC with 104 ch
    • HV= +-5600V
    • Gas: new system; valve open

    15/02/2013 18h23m:

    Changed HV to +-5600V

    10/02/2013 13h40m:

    Changed to low flux w/ new;
    reseted monitor data

    13/08/2012 11h41m:

    Changed to low flux

    09/08/2012 18h50m:

    Changed bottle (high flux)

    12/06/2012:

    Upgrade: SHT21 installed
    Temperature(violet) and Relative humidity
    restart

    26/03/2012:

    System crash: restarted plots
    old plots

    12/03/2012 14h05:

    Low Flux

    09/03/2012 17h08:

    New Bottle, High flux

  • About the setup

  • HV Read by Multimeter
    T1(black),T2(red): DS1621
    T3(green): TMP275
    Pressure: MPL115A
    T4(violet), Relative Humidity: SHT21

  • Time on plots in Lisbon Time)

  • RawData in root format

  • Data until 02/08/2013

 

www.lip.pt