CrossGrid WP4 tasks

LIP is involved in the CrossGrid Work Package 4 International Testbed Organisation. The  "WP4-International-Testbed-Organisation" document describe in detail the WP4 International Testbed Organization procedure. 

WP4 is subdivided in five tasks:

4.0 Testbed coordination and management, 

4.1 Testbed set-up and incremental evolution, 

4.2 Integration with DataGrid, 

4.3 Infrastructure Support, 

4.4 Verification and Quality Control (task 4.4 web site).


LIP involvement in task 4.1 (Testbed set-up and incremental evolution)

 

LIP involvement in task 4.2 (Integration with DataGrid)

 

LIP involvement in task 4.3 (Infrastructure support)

 

LIP involvement in task 4.4 (Verification and quality control)

LIP is the main responsible for the test, verification and evaluation of the testbed middleware. In the context of these activities LIP will setup a second separated testbed site dedicated to middleware test and validation. 

For more information see the task 4.4 web site at LIP.

 

 